This project consists of the Seismic Improvements to Washwater Tank. The project included new tank foundation, new anchor chairs, new tank shell stiffeners, repairing existing rafters, new mesh screen to overflow, modifying existing external inlet/outlet piping, provide new gasket to existing roof manway, remove existing center roof vent and install new center roof vent, provide new fall prevention system to existing interior ladder, provide new toe-boards for existing stairway, provide new tether points, and providing new patch plates for holes or pitted areas.

Even though the tank had been in service for 40+ years with no issues, a structural evaluation was done and determined that the foundation was severely undersized. Most contractors bid this job to install piles and pour a matte foundation under the tank in sections with it still in place. But with some careful planning and engineering, we were able to come up with a plan to move the entire tank 200′ off the existing pad. This specific situation is unique due to the fact that this a standpipe opposed to a flatbottom reservoir.

No other tank construction has the flexibility or material characteristics to allow this move which exemplifies the beauty of steel.

Award Name

Repair and Modification

Company Name

Paso Robles Tank, Inc.

Award Year

2023

Product Details

  • Washwater Tank Seismic Improvements
  • Santa Fe Irrigation District
  • Rancho Santa Fe, Calif.

Date Completed

January 27, 2023

Construction Standard

AWWA, API

Overall Height

80’

Column Height

74’-8”

Diameter

46’

Capacity

950,000

Steel Tonnage Used

25

Steel Thickness

1.5"