Regional Integrated Loop System Phase 3B
Regional Integrated Loop System Phase 3B
Sarasota County, Fla.
This Phase 3B project extends an existing 48″…
Tank Head w/ Tubesheet Holes Cut
Tank Head w/ Tubesheet Holes Cut
The recently installed nozzle hole cutting machine has…
Coal Silo Shell Conversion – Carbon to Stainless
Coal Silo Shell Conversion - Carbon to Stainless
Monroe, MI
DTE Energy Coal Mill Bunker Silo/Tank refurbishment consisted…
Fireguard Tank For Engine Laboratory
Fireguard Tank For Engine Laboratory
La Plata, Buenos Aires, Argentina
The project arises from the need of a…
Justin Winery Waste Water Expansion
Justin Winery Waste Water Expansion
Paso Robles, CA
(1) Rectangular Shop Built Waste Water Processing Tank…
20,300 Gallon API 12F Modified, Vertical Dual Wall, Vacuum Monitored Chlorine Dioxide Tank
20,300 Gallon API 12F Modified, Vertical Dual Wall, Vacuum Monitored Chlorine Dioxide Tank
Strathmore, AB, Canada
Harmony in design and fabrication – A 20,300…