Perched atop a steep hill and accessible only by narrow, winding roads, the Talladega standpipe project began with a formidable challenge: mobilization. The weather was relentless—freezing rain, snow flurries, and daytime temperatures dipping below 32 degrees. Yet, every piece of equipment, from a massive crane to six full material loads, had to reach the summit without shutting down the road below.

Through extraordinary coordination and determination, the team accomplished the impossible in just three days. Road closures were kept to a mere two hours, thanks to precise planning and the skill of a bulldozer operator who maneuvered trucks up the treacherous incline and positioned them on the tight site with surgical precision.

This effort became a showcase of collaboration—purchasing, fabrication, construction crews, subcontractors, engineers, safety teams, and project managers working in perfect sync. Once the last load was in place, the standpipe began to rise on schedule, a testament to perseverance and teamwork.

Today, the completed structure stands proudly on its hill, overlooking Talladega County. More than steel and bolts, it represents resilience and partnership—and will deliver clean, reliable water to the community for generations to come.

Award Name

Standpipe

Company Name

Fisher Tank Company

Award Year

2025

Product Details

  • Talladega Standpipe
  • Talladega County Commission
  • Talladega, Alabama, United States

Date Completed

abril 12, 2026

Construction Standard

AWWA D-100

Overall Height

58' 5 7/16"

Column Height

52'9"

Diameter

41'

Capacity

513,500

Steel Tonnage Used

55.3

Steel Thickness

.1875 - .3125

Affiliate Companies

TNEMEC coatings