This project is a new pump station in the city of Sacramento, California. It ties into existing 72” and 66” pipe.

This project consists of 72” suction piping and 66” discharge piping connected to each other by 6 qty 30” pumps and 1 qty 20” pump with the ability to add an additional 30” as well as 3 surge tanks.

Materials used in this project meet the requirements of the Build America Buy America Act with the fabrication meeting the requirements of AWWA C200 for the steel pipe, AWWA C205 for the cement mortar lining, AWWA C207 for the flanges, AWWA C208 for the steel fabricated fittings, AWWA C210 for the exposed liquid epoxy primer, and AWWA C222 for the buried polyurethane coating.

Award Name

Pipe Fabrication

Company Name

Mid America Pipe Fabricating & Supply

Award Year

2025

Product Details

  • Harvest Water Pumping Station
  • Regional San
  • Sacramento, CA, United States

Date Completed

abril 12, 2026

Construction Standard

AWWA C200

Diameter

12" to 72"

Steel Tonnage Used

252

Steel Thickness

1/4" to 3/8"

Steel Fitting Type

Flanged, Lap Weld, and Grooved Coupling