2025

Pipe Fabrication

Arcadia Lake WTP Process Improvements

Arcadia Lake WTP Process Improvements

Edmond, Oklahoma, United States

We supplied approximately 7,000 feet of AWWA C200 steel pipe ranging from 66 inches down to 20 inches OD. The project required a wide range of coatings, linings, fittings, and joint types to meet the structural, hydraulic, and installation demands of the upgraded treatment facilities. The expansion was a major multi-phase program designed to increase the City of Edmond’s surface-water treatment capacity.

Plant No. 1/FM 972 Pump Station

2022

Field Erected Tanks

Plant No. 1/FM 972 Pump Station

Plant No. 1/FM 972 Pump Station

Georgetown, TX

The project consisted of disassembling, relocating, and raising…

Athol Water System Improvement

2022

Field Erected Tanks

Athol Water System Improvement

Athol Water System Improvement

Athol, ID

The project consisted of raising an existing 94′-0″…

City of Leland - Elevated Water Storage Tank

2019

Elevated Tank

Winner

City of Leland – Elevated Water Storage Tank

City of Leland - Elevated Water Storage Tank

Leland, MS

Travelers along the highway in Leland, MS will…

Sports Park Elevated Water Storage Tank

2014

Elevated Tank

Winner

Sports Park Elevated Water Storage Tank

Sports Park Elevated Water Storage Tank

Reedley, CA

This Reedley, California community sure is proud of…

A series of 3,275 US gallon horizontal, integral contained storage tanks labelled ULC S601-14 for the periodic storage of pipeline-grade crude oil at a series of pump stations along a prominent oil pipeline in Canada and the United States.

2019

Shop Fabricated Atmospheric Tank

North American Pipeline Project

North American Pipeline Project

This project was a series of 3,275 US…