Elements

(Dynamic)


Dynamic elements automatically pull content in from other places (like a feed of blog posts).

In many cases, you can use CSS classes like .bg-dark, .larger or .invert to quickly modify the appearance of many of these sections. To learn more about available classes, visit your Style Guide.

Looking for more elements?
Visit your static elements library.

⚡️ Quick Tip

How to use classes in the page builder

All page builder elements, from rows, to columns, to modules, allow you to assign custom CSS classes to manipulate their appearance in a predefined way. We have indicated when this is the case with any of the elements below.

To assign a class to an element:

  1. Open the Row, Column, or Module settings.
  2. Click the "Advanced" tab.
  3. Scroll to the bottom.
  4. Enter your desired class in the "Classes" field. (To add multiple classes, separate them with a space.)
  5. Hit "Save"

Bonus: You can add the class invert to any element to create inverted text (like this!)

Click to open larger.

Feeds

Dynamic - Feed - Posts Grid

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

Dynamic - Feed - Resources Grid

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

Springing Forward

February 27, 2024

Springing Forward

Memory

February 20, 2024

Relying on Memory

February 13, 2024

STI SP001 AST Record

Dynamic - Feed - Events Grid

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

SP001 Inspection

April 5, 2024

International Aboveground Storage Tank Conference & Trade Show

SP001 and SP031 Updates and Revisions

Dynamic - Feed - Awards Grid

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

2022

Pipeline Project

Winner

Zone 3D and 4A Improvements Remote Facilities Booster Pump Station

Zone 3D and 4A Improvements Remote Facilities Booster Pump Station

Phoenix, AZ

2022

Pipeline Project

Winner

WRIP Phase 2 – Pipeline Segment 2C & 3

WRIP Phase 2 - Pipeline Segment 2C & 3

San Antonio, TX

This project consisted of the installation of approximately…

2022

Pipeline Project

Winner

Wyckoff WTP Clearwell #3

Wyckoff WTP Clearwell #3

Acworth, GA

This project is a new pipeline that attaches…

Dynamic - Feed - Person Grid

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

Cameron Moore

Cameron Moore, P.E.

PVENG

FEA Team Lead

Tyler Noesser

Tyler Noesser

alliantgroup

Technical Director

Barry Berquist

Barry Berquist

Bureau Veritas Inspection and Insurance Company

President

Dynamic - Feed - Affiliate of the Week Grid

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

Baril Coatings USA

Baril Coatings USA

Baril Coatings is a developer and producer of…

Steel Dynamics

Steel Dynamics is one of the largest steel…

Trinity Heads Inc.

Trinity Heads is a leading manufacturer of pressure…

Featured

Dynamic - Featured - Horizontal Card

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

Dynamic - Featured Card

Tip: Use this as a base for creating your own grid layouts. The partial is already prepped.

Dynamic - Newsletter Form

STAY UPDATED

Sign up for our Newsletter

Grids

Dynamic - Feed - Posts Grid with Filters

Dynamic - Feed - Events Grid with Filters

SP001 Inspection

April 5, 2024

International Aboveground Storage Tank Conference & Trade Show

SP001 and SP031 Updates and Revisions

California CUPA Forum

February 28, 2024

California Unified Program Annual Training Conference

Tank Manufacturing and Owner Tank Record

California CUPA Forum

February 28, 2024

California Unified Program Annual Training Conference

STI’s Role in Tank Listings and SP001/SP031 Updates

California CUPA Forum

February 27, 2024

California Unified Program Annual Training Conference

Correlating STI with APSA Inspections

Dynamic - Feed - Awards Grid with Filters

2022

Pipeline Project

Winner

Zone 3D and 4A Improvements Remote Facilities Booster Pump Station

Zone 3D and 4A Improvements Remote Facilities Booster Pump Station

Phoenix, AZ

2022

Pipeline Project

Winner

WRIP Phase 2 – Pipeline Segment 2C & 3

WRIP Phase 2 - Pipeline Segment 2C & 3

San Antonio, TX

This project consisted of the installation of approximately…

2022

Pipeline Project

Winner

Wyckoff WTP Clearwell #3

Wyckoff WTP Clearwell #3

Acworth, GA

This project is a new pipeline that attaches…

2022

Pipe Fabrication

Winner

Zone 3D and 4A Improvements Remote Facilities Booster Pump Station

Zone 3D and 4A Improvements Remote Facilities Booster Pump Station

Phoenix, AZ

The Zone 3D and 4A Improvements Program is…

2022

Pipe Fabrication

Winner

North Davis Sewer District 60″ Fabricated Manifold

North Davis Sewer District 60" Fabricated Manifold

Antelope Island, UT

This 60″ manifold was fabricated out of Duplex…

2022

Pipe Fabrication

Winner

East Bottoms Pump Station Phase #3

East Bottoms Pump Station Phase #3

Kansas City, MO

This material was provided for an existing pumping…

Dynamic - Feed - Resources Grid with Filters